Helicopter scan of transmission system rescheduled

Scans to occur March 21-22 as weather allows FORT COLLINS, Colo., – Contractors hired by Platte River Power Authority (Platte River) scheduled a low-flying helicopter to conduct aerial photography of Platte River’s transmission line structures. The purpose of the scans … Keep Reading

Helicopter and drone to scan transmission system

Scans to occur during the week of March 11 as weather conditions allow FORT COLLINS, Colo., – Contractors hired by Platte River Power Authority (Platte River) will use a low-flying helicopter and a drone to conduct aerial photography of Platte … Keep Reading

Platte River Board names new chair and vice chair

Kevin Gertig of Loveland Water and Power and Jeni Arndt of the City of Fort Collins FORT COLLINS, Colo., – During Platte River Power Authority’s first board meeting of 2024, the board of directors elected Kevin Gertig, director of Loveland … Keep Reading

Platte River’s path to a clean, reliable energy future

Platte River Power Authority is the community-owned wholesale electricity provider for Estes Park, Fort Collins, Longmont and Loveland. Platte River’s initial resources included hydropower, coal and natural gas. In 1998, Platte River was Colorado’s first utility to develop wind generation. … Keep Reading

Middle school students called to race
Posted on February 1, 2024

Middle school students called to race

Annual solar and battery car competition powering up FORT COLLINS, Colo. - Middle school students from the northern Colorado region are called to race in the fifth annual solar and battery model car competition, the NoCo Time Trials, hosted by … Keep Reading