Map of the Colorado River Storage Project sites and Loveland Area Project sites

Contract assignment: 1973
Unit names: Loveland Area Project (LAP) and Colorado River Storage Project (CRSP)
LAP capacity: summer: 30 megawatts
CRSP capacity: summer: 60 megawatts  
Fuel type:
hydropower
Operations: operated by the Bureau of Reclamation and marketed by Western Area Power Administration (WAPA)

Operations


  • Largest source of purchased power for Platte River system
  • Provides 19% of delivered energy on an average annual basis
  • Provides firm power capacity with firm transmission

Financials


  • Secured through long-term contracts with WAPA
  • Third-Lowest cost resource, following Rawhide unit 1 and Craig units 1 and 2

Environmental


  • Zero air emissions